Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page Skip Primary Navigation
EFW Home Page
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Information for Contractors Triangle Bullet Point Statements of Work/Work Elements Triangle Bullet Point Hatchery Operations and Maintenance (O&M)
This is a spacer graphic
This is a spacer graphicTriangle bullet pointUsing Pisces

This is a spacer graphicTriangle bullet pointStatements of Work/Work Elements

This is a spacer graphicTriangle bullet pointProject and Contract Budgets

This is a spacer graphicTriangle bullet pointReporting Requirements

This is a spacer graphicTriangle bullet pointContract Checklist

This is a spacer graphicTriangle bullet pointContract Changes

This is a spacer graphicTriangle bullet pointReport Center


Adjust your View!
Link to Firstgov


Hatchery Operations and Maintenance (O&M)



This category covers all activities necessary to operate and maintain an existing hatchery for both conservation and production purposes.

For planning, design and construction of new hatcheries, see the Hatchery Construction category of work elements.

The Hatchery O&M work elements are:
56. Acclimate Juvenile Fish
59. Incubate Eggs
60. Maintain Fish Health
61. Maintain Hatchery
63. Rear Fish
64. Spawn Fish
65. Transport Fish (expired)
66. Trap/Collect/Hold/Transport Fish - Hatchery
176. Produce Hatchery Fish
187. Put and Take Fisheries

See all Fish and Wildlife program work elements (PDF)


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

     
 Page last reviewed on 6/18/2008 2:22:18 PM