Trap/Collect/Hold/Transport Fish - Hatchery
Hatchery O&M | 66
|
Definition
Includes work performed under contracts solely for trapping, collecting, transporting, and/or holding fish (all life history stages) for inclusion in a fish culture program. If the full range of fish culture activities is performed under a contract, use WE# 176: Produce Hatchery Fish, with milestones for trapping, collecting, transporting, and/or holding fish, as appropriate.
Deliverables (recommended)
- Number and species of fish trapped/collected/held/transported. Location where they are trapped, collected, or held. Locations where they are transported to and from.
Rules and Examples (work element scenarios and associated rules)
Rule 1: Any ESA, NEPA, permitting, or other environmental compliance work should be split out under WE# 165, Produce Environmental Compliance Documentation.
Example:
WE: Trap/Collect/Hold/Transport Fish - Hatchery
WE Title: Operate adult fish trap at Elk Creek.
WE: Produce Environmental Compliance Documentation
WE Title: Obtain local permits & ESA compliance for operation of the adult fish trap at Elk Creek.
Rule 2: If the trapping program includes multiple locations and/or species, you may lump them into a single work element. However, you may wish to break the work into separate work elements for each location if it helps provide clarity for project management purposes.
Example:
Option 1 (lumping)
WE: Trap/Collect/Hold/Transport Fish - Hatchery
WE Title: Fish trapping, transfers, and planting in Cold River and Fast River basins
WE Description: Operate spring and summer Chinook traps at RM 4 and transport adults to Happy Fish Hatchery for spawning. Transport juveniles to acclimation sites on Cold River at RM 7 and RM 16 and Fast River at RM 12 and RM 21.
Option 2 (splitting)
WE: Trap/Collect/Hold/Transport Fish - Hatchery
WE Title: Operate Elk Creek spring Chinook trap.
WE Description: Operate traps and transport spring Chinook adults to Happy Fish Hatchery for spawning.
WE: Trap/Collect/Hold/Transport Fish - Hatchery
WE Title: Operate Deer Creek summer Chinook trap.
WE Description: Operate traps and transport summer Chinook adults to Happy Fish Hatchery for spawning.
WE: Trap/Collect/Hold/Transport Fish - Hatchery
WE Title: Transport summer Chinook juveniles for acclimation in Deer Creek.
WE Description: Transport summer Chinook juveniles from Happy Fish Hatchery to acclimation site on Deer Creek.
Milestones (may include)
- Environmental compliance requirements complete
On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).
- Trap operation - dates
- Transport adults
- Transport juveniles
Metrics
| Metric |
Metric Type |
Metric Guidance |
Metric Required |
Metric Type |
Metric Precision |
| 1410 |
Purpose of production program [Supplementation, Harvest Augmentation, Research] |
Drop-down box. Supplement natural populations to help recovery, increase Harvest opportunities, or Research. |
Required |
list |
|
| 1426 |
# eggs (hatchery origin) |
# of hatchery origin eggs shipped to a facility or release site |
Required |
number |
1.0 |
| 1427 |
# eggs (natural origin) |
# of natural origin eggs shipped to a facility or release site |
Required |
number |
1.0 |
| 1428 |
# ad-clip (hatchery origin) smolts |
# of hatchery origin smolts shipped to a facility or release site |
Required |
number |
1.0 |
| 1429 |
# non-clip (natural origin) smolts |
# of natural origin smolts shipped to a facility or release site |
Required |
number |
1.0 |
| 1430 |
# ad-clip (hatchery origin) juveniles (presmolt) |
# of hatchery origin presmolts shipped to a facility or release site |
Required |
number |
1.0 |
| 1431 |
# non-clip (natural origin) juveniles (presmolt) |
# of natural origin presmolts shipped to a facility or release site |
Required |
number |
1.0 |
| 1432 |
# ad-clip (hatchery origin) adults |
# of hatchery origin adults shipped to a facility or release site |
Required |
number |
1.0 |
| 1433 |
# non-clip (natural origin) adults |
# of natural origin adults shipped to a facility or release site |
Required |
number |
1.0 |
| 1489 |
Secondary purpose of production program (if any) [Supplementation, Harvest Augmentation, Research] |
If there is a secondary purpose for the production different from the primary purpose, select it here. Otherwise, uncheck the metric. Secondary purpose of production includes: Supplement natural populations to help recovery, increase Harvest opportunities, or Research. |
Optional |
list |
|
Location Guidance
You may enter more than one point for this work element to describe multiple collection, holding, and release sites. If a location already exists in Pisces, click the "Link" button to synchronize locations. If not, enter a location and location description for this work element to enable future linking.
Environmental Compliance
Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time. Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances. National Environmental Policy Act (NEPA)
NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion. Endangered Species Act (ESA)
ESA consultation is typically required for this work element. National Historic Preservation Act (NHPA)
NHPA Section 106 consultation is typically not required for this work element. Public Involvement
Public involvement is typically required for this work element. The contractor should work with BPA Environmental staff to document previous or ongoing outreach efforts associated with this work or to develop a public involvement plan.
Associated Work Elements
- If the full range of fish culture activities is performed under a contract, use WE# 176: Produce Hatchery Fish.
- If a hatchery O&M contract involves only one or two fish culture activities such as trapping/collecting/holding fish or acclimation of juvenile fish, one or more of these specific work elements may be used, as appropriate: WE# 64, Spawn Fish; WE# 59, Incubate Eggs; WE# 63, Rear Fish; WE# 56, Acclimate Juvenile Fish; WE# 60, Maintain Fish Health.
- Maintenance of a trapping/collection/holding facility is covered under WE# 61, Maintain Hatchery.
- All put and take fishery work is covered under WE# 187, Put and Take Fisheries.
|
|