Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page Skip Primary Navigation
EFW Home Page
BPA Home Triangle Bullet Point EFW Home Triangle Bullet Point Information for Contractors Triangle Bullet Point Statements of Work/Work Elements Triangle Bullet Point Land Acquisition/Conservation Easement Triangle Bullet Point Purchase Fee Title Land/Easement
This is a spacer graphic
This is a spacer graphicTriangle bullet pointUsing Pisces

This is a spacer graphicTriangle bullet pointStatements of Work/Work Elements

This is a spacer graphicTriangle bullet pointProject and Contract Budgets

This is a spacer graphicTriangle bullet pointReporting Requirements

This is a spacer graphicTriangle bullet pointContract Checklist

This is a spacer graphicTriangle bullet pointContract Changes

This is a spacer graphicTriangle bullet pointReport Center


Adjust your View!
Link to Firstgov


Purchase Fee Title Land/Easement


This work element is expired.
Please use WE# 5, Land Purchase. [11/23/2004]

Land Acquisition / Conservation Easement

97



Definition
table top
Contact
Gerald McClintock
(503) 230-5375
table bottom
Used when the contractor acquires fee title or a conservation easement and is reimbursed by BPA for a portion or for all of the acquisition (see WE# 5: Land Purchase, if BPA is coordinating payment directly with the seller).

Metrics

No metrics needed for this work element.

Location Guidance

No location needed for this work element.

Environmental Compliance

Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA's Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.
  • Endangered Species Act (ESA)
    ESA consultation is typically not required for this work element.
  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.
  • Public Involvement
    Public involvement is typically not required for this work element.




  • If you believe information on this site is missing or in error, please Submit that comment here.
    NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy

         
     Page last reviewed on 5/28/2008 9:07:25 AM