|
|
Produce Design and/or Specifications
Planning and Coordination | 175
|
Definition
Covers all work associated with the preparation of engineering or technical drawings, specifications and/or budgets required for the construction/installation of any structure or facility. May include ancillary work such as land surveying, photogrammetric surveys, field surveys, etc. For construction work not requiring a formal design (e.g., installation of a barbed-wire fence), this work may be included as a milestone under the corresponding work element.
Deliverables (recommended)
- Diagrams, drawings
- Draft design - include % completed (only when final design will not be ready
by the end of the contract period).
- Final design
Rules and Examples (work element scenarios and associated rules)
Rule 1: Any significant ESA, NEPA, permitting, or other environmental compliance work should be split out under WE# 165, Produce Environmental Compliance Documentation.
Example:
WE: Produce Design and/or Specifications
WE Title: Armstrong Diversion Fish Screen
WE Description: Finalize the engineering designs for the Armstrong Diversion Fish Screen.
WE: Produce Environmental Compliance Documentation
WE Title: Armstrong Diversion Fish Screen
WE Description: Obtain local permits and work with BPA staff to ensure environmental compliance associated with Armstrong Diversion Fish Screen.
Rule 2: If you are producing designs for projects in more than one location, you may still lump them under a single work element. However, you may wish to break the work into separate work elements if it provides clarity or better supports project management.
Example:
Option 1 (lumping)
WE: Produce Design and/or Specifications
WE Title: Armstrong Diversion Fish Screen and Loble Diversion Pipeline
WE Description: Finalize the engineering designs for the Armstrong Diversion Fish Screen and develop the design for the Loble Diversion pipeline.
Option 2 (splitting)
WE: Produce Design and/or Specifications
WE Title: Armstrong Diversion Fish Screen
WE Description: Finalize the engineering designs for the Armstrong Diversion Fish Screen.
WE: Produce Design and/or Specifications
WE Title: Loble Diversion Pipeline
WE Description: Develop the design for the Loble Diversion pipeline.
Milestones (may include)
- Submit draft design for peer review
- Hold/attend scoping or stakeholder meeting
- Hold/attend meeting to review design
- Complete survey
- Write specifications
- Determine cost estimate, including cultural surveys, permitting, construction, and M&E
- Submit drawings to BPA
Metrics
No metrics needed for this work element.
Location Guidance
Identify point at each location where construction and/or installation of the structure itself will take place (design being a component of that construction/installation).
If the structure and its location are already in Pisces, click the "Link" button to synchronize locations. If not, enter a location and location description for this work element to enable future linking.
You may enter or link more than one point for this work element.
Environmental Compliance
Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA's Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time. Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA's Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances. National Environmental Policy Act (NEPA)
NEPA coverage for this work element will be identified by BPA's Environmental Compliance Lead. Endangered Species Act (ESA)
ESA consultation is typically not required for this work element. National Historic Preservation Act (NHPA)
NHPA Section 106 consultation is typically not required for this work element. Public Involvement
Public involvement is typically not required for this work element.
Associated Work Elements
|
|