PROJECT DESCRIPTION:
Bonneville Power Administration (BPA) has been asked by Puget Sound Energy
Inc. (PSE) to interconnect up to 1250 megawatts of electricity generated from
PSE's proposed Lower Snake River Wind Energy Project in Garfield and Columbia
counties, Washington to the Federal Columbia River Transmission System. PSE
proposes to independently build, own, and operate the Lower Snake River Wind
Energy Project and its associated facilities. To begin the siting process
for its proposed wind project, PSE submitted an application for a Conditional
Use Permit to Garfield County in January 2009. Garfield County, in consultation
with Columbia County, is conducting a State Environmental Policy Act process
for its consideration of PSE's proposed wind project. A final Environmental
Impact Statement that addressed impacts of the entire project was released
by Garfield County on October 7, 2009.
BPA proposes to build a new 500/230 kilovolt (kV) substation along its two
existing Little Goose -Lower Granite 500-kV transmission lines to provide
interconnection for PSE's Lower Snake River Winder Energy Project. This new
facility, called Central Ferry Substation, would require approximately 25
acres of land in the Pomeroy area of Garfield County, Wash. The substation
would be located adjacent to the existing transmission line rights-of-way.
-
CURRENT STATUS:
BPA is in the process of collecting environmental data concerning the proposed
interconnection, and currently anticipates completion of its environmental
review for this proposal in the next two to four months. If BPA determines
that the decision to interconnect PSE's proposed wind project is consistent
with BPA's Business Plan Environmental Impact Statement (BP EIS), BPA will
prepare a record of decision (ROD) tiered to the BP EIS and its associated
ROD. If there is a decision to proceed, BPA would offer PSE an agreement to
interconnect the proposed wind project to BPA's transmission system.
-
COMMENTS:
BPA invites you to comment on BPA's interconnection proposal. Comments will
be accepted through November 16, 2009. You may submit comments to BPA online
at: www.bpa.gov/comment, via mail
to: Bonneville Power Administration, Public Affairs Office - DKC-7, P.O. Box
14428, Portland, OR, 97293-4428, or fax your comments to (503) 230-3285. You
also may call us with your comments toll free at (800) 622-4519. Please reference
"Central Ferry Substation" with your comments. We will post all comments we
receive on our Web site at www.bpa.gov/comment.
-
CONTACT:
For further information on this project, please contact Tish
Eaton, BPA Environmental Lead.
-
DOCUMENTS:
Public Letter (32Kb pdf) (10/16/09)
Comment Form (35Kb pdf) (10/16/09
Project Vicinity Map (146Kb pdf) (10/06/09)
|
|