Klondike III/Biglow Canyon Wind Integration Project
-
PROJECT DESCRIPTION:
BPA has decided to interconnect 300 megawatts (MW) of electricity generated
from the proposed Klondike III Wind Project been by PPM Energy, Inc. and to
interconnect 400 MW of electricity from the Biglow Canyon Wind Farm, owned
by Portland General Electric and located north and east of the proposed Klondike
III Wind Project, to the Federal Columbia River Transmission System. To interconnect
these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt
(kV) double-circuit transmission line between the wind projects and BPA's
new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand
its existing 500-kV John Day Substation.
-
CURRENT STATUS:
BPA prepared an EIS that considered the impacts of the interconnection facilities,
the reasonably foreseeable environmental consequences of construction, operation
and maintenance of the proposed Klondike III and Biglow Canyon Wind Farm projects
and transmission facilities, and the cumulative impacts that could result
from projects in the area, including other proposed wind projects.
Bonneville Power Administration has prepared a Record of Decision (ROD) for
the Klondike III/Biglow Canyon Wind Integration Project. BPA has decided to
implement the proposed action identified in the EIS. Construction of BPA's
new substation could began in November 2006 and is ongoing, and construction
on the transmission line began in spring 2007 and was completed in September
2007.
-
CONTACT:
Gene Lynard, Bonneville Power Administration - KEC-4, P.O. Box 3621, Portland,
Oregon 97208-3621, toll-free telephone 1-800-282-3713; direct phone number
503-230-3790, fax number 503-230-5699, email gplynard@bpa.gov.
-
DOCUMENTS:
- ROD
(165 KB pdf) (10/25/06)
- ROD Cover Letter
(137 KB pdf) (10/25/06)
- Final EIS Public
Letter (135 KB pdf) (09/15/06)
- Final Environmental Impact
Statement (FEIS) (2.68 MB pdf) (September
2006)
- Appendix A - Cumulative Impacts Analysis
For Avian Resources From Proposed Wind Projects In Sherman County,
Washington (544 KB pdf)
- Appendix B - Visual Resources Technical
Memorandum (7.99 MB pdf)
- Appendix C - Electrical Effects (279
KB pdf)
- Appendix D - Assessment Of
Research Regarding EMF and Health And Environmental Effects
- Appendix E - Contractor Disclosure
Forms (465 KB pdf)
- Appendix F - Before The
Energy Facility Siting Council of The State of Oregon In the Matter
of the Application for a Site Certificate for the Klondike III Wind
Project, Final Order on the Application. The Oregon Energy Facility
Siting Council, June 30, 2006 (732 KB pdf)
- Appendix G - The
Oregon Energy Facility Siting Council Site Certificate for the Klondike
Wind Project, June 30, 2006 (144 KB pdf)
- Appendix H - Before
The Energy Facility Siting Council of The State of Oregon In the Matter
of the Application for a Site Certificate for the Biglow Canyon Wind
Farm, Final Order. Oregon Department of Energy, June 30, 2006
(771 KB pdf) (includes the following attachments)
- Attachment A - Biglow Canyon Wind Farm: Wildlife Monitoring
and Mitigation Plan, June 30, 2006
- Attachment B - Biglow Canyon Wind Farm: Revegetation Plan, June
30, 2006
- Attachment C - Biglow Canyon Wind Farm: Habitat Mitigation Plan,
June 30, 2006
- Appendix I -
The Oregon Energy Facility Siting Council Site Certificate for the
Biglow Canyon Wind Farm, June 30, 2006 (742 KB pdf)
- Appendix J - Wind Turbine
Locations (1.16 MB pdf)
- Figure 2: Proposed Wind
Turbines (195 KB pdf) (08-14-06)
- Map 1: Project Vicinity (666 KB pdf) (04/06/06)
- Map 2: Alternatives Eliminated from Construction
(284 KB pdf) (04/06/06)
- Map 3: Transportation System (709 KB pdf)
(04/06/06)
- Map 4: Recreational Opportunities (273 KB
pdf) (04/06/06)
- Map 5: Soils (1.3
MB pdf) (04/06/06)
- Map 6: Waterway/Wetland Crossings (709 KB
pdf) (04/06/06)
- Map 7: Sensitive Visual Resources (298 KB
pdf) (04/06/06)
- Map 8: Visibility Analysis
for Oregon (3.67 MB pdf) (07/11/06)
- Map 9: Visibility Analysis
for Washington (2.52 MB pdf) (07/11/06)
- Draft
EIS Public Letter (137 KB pdf) (05/01/06)
- Draft Environmental Impact Statement
(DEIS) (736 KB pdf) (April 2006)
- Extension
of Scope and Comment Period Letter (52.4 KB pdf) (12/02/05)
- Extension Comment Form
(19.2 KB) (12/01/05)
- Extension Period Project
Map (2 MB pdf) (11/22/05)
- Notice of
Extension (NOE) of Comment Period for Environmental Impact Statement (EIS)
(28.5 KB pdf) (11/22/05)
- Project Scoping Letter
(58 KB pdf) (04/12/05)
- Updated Project
Map (416 KB pdf) (03/31/05)
-
Project Scoping Letter (47 KB pdf) (02/24/05)
-
Updated Project Map (274 KB pdf) (02/23/05)
- Updated Project Map (273 KB
pdf) (02/15/05)
- Project Scoping Letter (45
KB pdf) (02/15/05)
- Comment Form (13 KB pdf) (02/15/05)
- Notice of Intent to Prepare
an EIS (27 KB pdf) (02/09/05)
- Project Map (191 KB pdf) (01/20/05)
|
|