Leaning Juniper II - Jones Canyon Substation Expansion Wind
Interconnection Project
-
PROJECT DESCRIPTION:
BPA has been asked by Iberdrola Renewables, Inc. (Iberdrola), to interconnect up to 200 megawatts of electricity generated from the proposed Leaning Juniper II Wind Power Project in Gilliam County, Oregon, to the Federal Columbia River Transmission System. Iberdrola would independently build, own and operate the wind project and their associated facilities.
Iberdrola acquired site certification through the State of Oregon Energy Facility Siting Council (EFSC) on September 21, 2007.
-
CURRENT STATUS:
The BPA interconnection project has completed the environmental review stage and is proceeding to construction. BPA issued a Record of Decision (ROD) under the National Environmental Policy Act (NEPA) on April 3, 2009. BPA believes the decision to interconnect the wind project is consistent with BPA's Business Plan ROD, August 1995 and Business Plan Environmental Impact Statement (EIS), June 1995.
-
CONTACT:
Andrew M. Montaņo, Environmental Project Manager, Bonneville Power Administration - KEC-4, P.O. Box 3621, Portland, Oregon, 97208-3621; direct telephone number 503-230-4145; toll-free telephone number 1-800-282-3713; fax number 503-230-5699; e-mail address: ammontano@bpa.gov.
-
DOCUMENTS:
ROD Public Letter (29Kb PDF) (04/09/09)
Record of Decision (150Kb PDF) (March 2009)
Letter to the
Public (30Kb PDF) (01/06/09)
Project Vicinity Map (372Kb
PDF) (01/06/09)
Comment Form (13Kb PDF) (01/06/09)
|
|